  • New structures located in the same general location as existing structures
  • Complies with mandatory standards to ensure safety, reliability and to meet future needs
  • Replaces aging infrastructure
  • Strengthens area reliability
  • Connects renewable resources to the electric grid.

Timeline (View Full Timeline)

  • March 2024 – Project announcement mailed to neighbors
  • Spring 2024 – Project kickoff, engineering, and permitting
  • Fall 2025 – Site preparation activities: Access roads, forestry, and right of way preparation
  • Fall 2025 – Begin Line 218 rebuild from Everetts Substation to Greenville Interconnection
  • Early 2026 – Begin Line 25 partial rebuild and Trowbridge Substation construction
  • Late 2027 – Construction complete
  • Spring 2028 – Final restoration of impacted areas

Impacts

Service Interruption

Your electric service is not expected to be impacted by this project.

Traffic

There may be some traffic delays.

Noise

Noise levels will be minimal; permits are in place.

Environment

This project may have limited environmental impacts.

Neighborhood

Access to surrounding neighborhoods will not be impacted.