Buena-Vista

Benefits

  • Maintains current right of way
  • New structures located in the same general location as existing structures
  • Complies with mandatory standards to ensure safety, reliability and to meet future needs
  • Minimizes impact to the community and environment
  • Replaces aging infrastructure

Timeline (View Full Timeline)

  • Fall 2025 – Complete construction
  • Early 2024 – Begin construction
  • Q2 2021 – Q2 2023 – Permitting activities, coordination with stakeholders, and conceptual design
  • March 2021 – Project announcement sent to community

Contact Us

Call us M - F, 8 a.m. - 5 p.m.

888-291-0190

Documents

Construction-Related Impacts

Service Interruption

There are no planned service interruptions for this project.

Aging Infrastructure

100 Years

The equipment has been in service for nearly 100 years and needs to be replaced.

Traffic

This project is not expected to impact traffic.

Neighborhood

Access to surrounding neighborhoods will not be impacted.

Transmission Corridor Conditions

Existing

  • Project area is 10 miles long
  • Right of way is primarily 100 feet wide with 120-foot and 140-foot sections
  • Primarily galvanized steel lattice structures with some galvanized steel monopole structures

Proposed

  • Utilize existing right of way corridor
  • Install brown, weathering-steel H-frames throughout most of the corridor. Weathering steel monopole and 3-pole structures will be used in some locations.