Skip to Content

Choose Your State of Service

In order to serve you better, please select your Dominion Energy location services.

Choose Your State of Service

In order to serve you better, please select your Dominion Energy location services.

Select my State

Show Dominion.com Menu
Buena-Vista

Benefits

  • Maintains current right of way
  • New structures located in the same general location as existing structures
  • Complies with mandatory standards to ensure safety, reliability and to meet future needs
  • Minimizes impact to the community and environment
  • Replaces aging infrastructure

Timeline (View Full Timeline)

Phase 1:
  • Late Summer 2024 – Complete construction
  • Late Summer 2025 – Begin construction
  • Late Summer 2025 –Restoration of work area
Phase 2:
  • Late Summer 2025 –Begin construction
  • Late Summer 2026 –Complete construction
  • Late Summer 2026 –Restoration of work area

Construction-Related Impacts

Service Interruption

There are no planned service interruptions for this project.

Traffic

This project is not expected to impact traffic.

Neighborhood

Access to surrounding neighborhoods will not be impacted.

Transmission Corridor Conditions

Existing

  • Project area is 10 miles long
  • Right of way is primarily 100 feet wide with 120-foot and 140-foot sections
  • Primarily galvanized steel lattice structures with some galvanized steel monopole structures

Proposed

  • Utilize existing right of way corridor
  • Install brown, weathering-steel H-frames throughout most of the corridor. Weathering steel monopole and 3-pole structures will be used in some locations.

Interactive Portal

Related Links

caret
More Links