PHASE 2: 2025
Build new single circuit 230 kV electric transmission line to connect existing Farmwell Substation to new Nimbus Substation
PHASE 1: SUMMER 2023 – DECEMBER 2024
July 2023 - Nimbus Substation site preparation, including building a retaining wall for soil stability; 2024 - Build new double circuit 230 kilovolt (kV) electric transmission line to connect an existing transmission line to Nimbus Substation along the south side of Waxpool Road
February 3, 2022
Virtual Community Meeting
February 2022
Project filed with the SCC
November 2021–February 2022
Outreach to the community