Highlights

Map highlighting Halifax County, Virginia
  • BD Lead: Adam Thompson, 804-229-9735
  • Location: Halifax County, VA
  • Anticipated COD: 2024
  • Estimated Project Capacity: 100 MWac
  • Acreage: 1,316 acres
  • Regulatory Filing: CE-3
  • Estimated NPV: TBD
  • Governance: TBD

Initial Environmental Justice Considerations

  • The county has a slightly higher minority population than the state (40.5% compared to 38.5%).
  • All across the state, in Halifax County, and in the block group assessed that include the current land control, the predominant minority group is Black/African American.
  • Once a final project footprint is determined, a full EJ analysis will be performed and once an EJ community is identified, targeted outreach will take place.

Interconnection

  • Queue Number: AG1-105
  • POI1 –New switching substation on VEPCO Clover to Farmville 230 kV
  • Interconnection Cost : TBD

Preliminary Timeline

  • Initiate Stage 1 Diligence and preliminary site plan development: October 2020
  • Early County outreach: October/November 2020
  • Introductory meeting with key county leader held 10/25/2020
  • Preliminary Site Development: November/December 2020
  • Development of Conceptual Site Plan (includes setbacks and screening)
  • Conditional Use Permit: Pre-Application meeting: December 2020/January 2021
  • Conceptual Site Plan revision
  • Public Open House: January 2021
  • File CUP/SUP Application: February 2021
  • Planning Commission Meeting: April 2021 (Plan for 2 meetings)
  • Board of Supervisors Meeting: July 2021 (Plan for 2 meetings)
  • CE-3 Dominion RFP Submittal: Sept. 1, 2022
  • Initiate Construction: Spring 2022
  • Commercial Operation: 2024